19+ completed and ongoing projects across CALABARZON and Metro Manila since 2018.
Residential
Sta. Barbara, Pangasinan. Rooftop solar with battery storage.
Residential
Bacood, Sta. Mesa. 3 storey with roofdeck, 2018.
Residential
Manila Southwoods, Carmona. 1 storey with basement, 2019.
Residential
Manila Southwoods, Carmona. 200kVA, Dec 2024.
Residential
Garcia Heights, Parañaque City. 50kVA, Nov 2024.
Commercial
500kVA building electrical wiring, service and feeder system, 2023.
Commercial
Replacement of 3 x 25kVA transformer.
Commercial
BGC, Taguig. MCCB replacement and busbar insulation, 2018.
Commercial
Anabu, Imus. 4 storey electrical system, 2019.
Commercial
Salawag, Dasmariñas. Service, metering and wiring, 2021 to 2022.
Commercial
Bgy. San Gabriel, GMA. Wiring and metering center, 2022.
Industrial
Supply and installation of 2 x 1250kVA generator with synchronizer and ATS.
Industrial
First private pole work at Ninoy Aquino, Dr. Santos and Redemptorist stations.
Industrial
Medium voltage first private pole, 2000kVA power transformer and switch gear.
Industrial
First private pole and 1.5MVA pad mounted transformer replacement.
Industrial
Marawoy, Lipa City. Main feeder and distribution system, 2018.
Industrial
Diliman, Quezon City. 1250kVA standby generator with ATS integration.
Industrial
Camp Vicente Lim, Cabuyao. 50kVA pole mounted transformer with metering.
Industrial
Silang, Cavite. Training center electrical system, ongoing.
Institutional & Infrastructure
Primary and secondary metering.
Institutional & Infrastructure
First Cavite Industrial Estate. Ongoing feeder upgrades since 2018, 1MVA to 2MVA.
Institutional & Infrastructure
GMA, Cavite. Ongoing retrofit and metering relationship since 2018.
Institutional & Infrastructure
500kVA building electrical wiring, service and feeder system, 2023.
Institutional & Infrastructure
Sterling Technopark, Carmona. Installation service and 750kVA main feeder.
Institutional & Infrastructure
EPZA, Rosario. Design and build electrical system, ongoing.